Enterprise manufacturing platform — Go live in 60 days. Schedule an executive briefing.Book a demo
FOSFactoryOperating System

Machine Tools & SPM

ERP for Machine Tools & Special Purpose Machines

Long-lead builds, evolving project BOMs and milestone billing — FOS keeps every special-purpose machine tracked to budget.

Configured for Machine Tools & SPM · Go live in ~60 days

Project BOMs that change faster than the spreadsheet.

Long-lead items ordered late, holding up assembly.

Costs that only reconcile after the machine ships.

Milestone billing tracked outside the system.

A six-month build — and no idea if it is on budget.

There's a better way to run this shop

How FOS runs your process

The workflows built for how you actually manufacture.

01 Project BOM

One evolving source of truth.

Project BOMs and assembly milestones.

Design changes flow into the live project BOM. FOS re-plans long-lead procurement and tracks each assembly milestone against the plan.

Book a walkthrough
1Design freeze
Project BOM v3
2Long-lead procurement
Spindle · due wk 9
3Sub-assembly
In progress · 40%
4Integration & FAT
Scheduled
Milestones trackedLive
02 Costing

Know the margin before FAT.

Machine-wise cost, as it builds.

Every issue, hour and PO posts to the machine cost sheet — so you see budget vs actual while there is still time to act.

Book a walkthrough
Machine SPM-118
₹62 LBudget
₹58 LActual to date
wk 9Of 14
+6%Margin
Budget vs actualReal time
What you get

Built for Machine Tools & SPM

The capabilities that matter most for your line of work.

Engineer-to-order

Quote, design and build made-to-order machines end to end.

Project BOM & milestones

Live BOMs and milestone tracking as the design evolves.

Long-lead procurement

Plan and order long-lead items before they hold up assembly.

Machine-wise costing

Budget vs actual per machine, in real time.

On timeMilestone delivery
+6%Avg. project margin
0Late long-lead items
1Live project BOM

See FOS configured for your shop floor.

A 30-minute walkthrough mapped to how you build — no obligation.

Book your demo

No obligation · Industry-tuned demo · Response within 1 business day

Frequently asked questions.

Top questions about machine tools ERP — answered for manufacturers in India.

How does FOS fit machine tool builders?

Machine tool plants combine long-cycle ETO assemblies, precision machining, bought-out controls, and commissioning. FOS connects engineering BOMs, floor execution, and project costing on one platform.

Can FOS manage engineering change on complex BOMs?

Revision control on BOMs and effectivity dates ensures shop builds the correct structure per order. Pending changes flag open work orders before wrong parts are machined.

How are long-lead imported components planned?

Critical bought-out spindles, drives, and controls carry extended lead times in MRP. Early PO placement aligns with base frame fabrication milestones.

Does FOS support trial run and FAT stages?

Routings include assembly, trial, FAT, and paint with hold points for quality sign-off. Customer witness inspections can be recorded before dispatch.

Can we track hours per machine build for costing?

Labour reporting on operations accumulates actual hours against estimates. Project managers compare standard vs actual for future quoting accuracy.

How does service and spares work for installed machines?

Spare BOMs and service orders manage aftermarket parts separately from new machine backlog. Serial-linked history supports field service and warranty claims.

What about heavy casting and machining subcontract?

Casting and heat treatment steps as subcontract operations track material and return dates. Machining in-house starts only when castings are available and approved.

Can FOS handle multiple simultaneous machine projects?

Project dashboards show WIP, material readiness, and milestone dates per machine serial. Management allocates bottleneck machining capacity across orders.

How are electrical panel and control integration tracked?

Sub-assemblies for panels and cabling appear as sub-BOMs with their own routings. Final integration sequence ensures controls are tested before customer dispatch.

Is FOS suitable for job-shop and series machine builders?

Both modes work: one-off custom machines use order-specific BOMs; series builders use standard structures with option variants. Same modules scale across product lines.

Executive briefing

Ready to standardize operations?

See FOS mapped to your industry and modules in a focused 30-minute session — no obligation, no generic pitch deck.

  • Live in ~6 weeks
  • Industry-specific scope
  • Response in 1 business day